FEATURE

WHAT'S INCLUDED

Project management
Through the control and management of progress, quality, safety, cost and other aspects, the expectation can be
View more +
Management means
Through the control and management of progress, quality, safety, cost and other aspects, the expectation can be
View more +
Management object
The human resources, technology, capital, materials, equipment and many other factors of production are reasonably...
View more +
Guarantee
Material supply machinery and equipment
1.Balance the distribution of labor force and arrange personnel construction according to the schedule;
2.Hold regular personnel adjustment meetings to allocate personnel, materials and equipment according to the specific construction situation;
3.Ensure normal construction during busy farming and holidays;
4.Make full preparation for labor mobilization and reasonably arrange the normal construction of relevant operators.
Technical guarantee measures
1.Balance the distribution of labor force and arrange personnel construction according to the schedule;
2.Hold regular personnel adjustment meetings to allocate personnel, materials and equipment according to the specific construction situation;
3.Ensure normal construction during busy farming and holidays;
4.Make full preparation for labor mobilization and reasonably arrange the normal construction of relevant operators.
Technical guarantee measures
1.Balance the distribution of labor force and arrange personnel construction according to the schedule;
2.Hold regular personnel adjustment meetings to allocate personnel, materials and equipment according to the specific construction situation;
3.Ensure normal construction during busy farming and holidays;
4.Make full preparation for labor mobilization and reasonably arrange the normal construction of relevant operators.
Construction preparation
1. Appoint the project manager and implement the project manager responsibility system.
2. Set up an ad hoc group to determine the organizational form and personnel distribution according to the scale, structural complexity, professional characteristics, personnel quality and geographical scope of the construction project.
3. Prepare construction project management plan and rules and regulations to guide and standardize the management of construction projects.
4. Prepare construction organization design and quality plan to guide and standardize construction preparation and construction process.
5. Construction site preparation to make the site have construction conditions and ensure safe and civilized construction.
6. Prepare commencement application report and submit it for approval.
Construction progress
1. Organize and manage the construction according to the construction organization design.
2. Through the dynamic control of construction project objective management, appropriate management measures, technical measures, economic measures, etc. are adopted to ensure the realization of the expected objectives of the construction project, such as progress, quality, cost, safety production management, civilized construction management, etc.
3. Strengthen the contract management, site management, production management, information management and project organization and coordination of construction projects.
4. Make records, collect and sort out construction management data in time.
Final acceptance of construction
After the whole construction project has been completed according to the design requirements and the commissioning is qualified, and the pre inspection results meet the completion acceptance standards of the project, the completion acceptance shall be organized. After the completion acceptance, the completion settlement and project handover procedures shall be handled.
After-sale service
In order to ensure the normal use of the project and maintain the good reputation of the construction unit, the construction unit should regularly carry out the project return visit, listen to the opinions of the user, summarize the experience and lessons, understand and observe the problems in use, and provide necessary maintenance, repair, warranty and technical consultation services.
1 years overall project warranty
Permanent anti leakage engineering warranty
Regular return visit
48 hours on site service